In 1945 permanent tracks were laid for the child size train owned by George Overmyer. In previous years the train had run on temporary tracks, but Overmyer was given a long term concession to have the train in the park.
Train on temporary tracks:
![](https://static.wixstatic.com/media/e0bd80_e62ff68ad21743a9bef832a041b23bae~mv2.jpg/v1/fill/w_147,h_115,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/e0bd80_e62ff68ad21743a9bef832a041b23bae~mv2.jpg)
Building the permanent tracks:
![](https://static.wixstatic.com/media/e0bd80_13c17845ddde4ee3a45252369c8bf611~mv2.jpg/v1/fill/w_147,h_190,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/e0bd80_13c17845ddde4ee3a45252369c8bf611~mv2.jpg)
Opening day for the new train rides at Miller Park!
![](https://static.wixstatic.com/media/a27d24_76a7d48669b4459c9f2954bbccecdf0d~mv2.jpg/v1/fill/w_147,h_102,al_c,q_80,usm_0.66_1.00_0.01,blur_2,enc_auto/a27d24_76a7d48669b4459c9f2954bbccecdf0d~mv2.jpg)